Product and Application training at DILO Armaturen und Anlagen GmbH is now being blended

Hidden champion in emission-free gas handling

Overview

How the challenge was solved

Define requir­em­ents and knock-out criteria

Market research and multi-stage selection process

Pres­ent­at­ions and pilot tests with the trainer team

Didactics workshop and blended learning concept

Close-up of trainers at a starting line on a running track, with the legs of other runners blurred in the background.
Initial situation

Training downtime during lockdown

Key requirements

How can external support help with the selection? 

DILO was looking for support in selecting and implem­enting a global learning management system. The aim was to structure and prioritise the requir­em­ents and evaluate providers objectively. A practical test was designed to determine from a technical perspective whether the planned blended-learning concept could be implemented. The concept was intended to combine e-learning, webinars and face-to-face training in a meaningful way. In addition, kothes supported DILO in developing trainer capab­il­ities and establ­ishing editorial and translation processes, enabling flexible, practical customer training that could be delivered worldwide.

Support in selecting a system

Empowering DILO

Develop a practical learning concept

Several runners in motion; in the foreground, legs and blue running shoes; the background is blurred.
Approach

How can you find the right Learning Management System?

Blended learning: Learn flexibly, put knowledge into practice

Rotes Zielband mit der Aufschrift „FINISH“ über einer Laufbahn; im Hintergrund unscharf der Zieleinlauf.
Benefit

How does DILO reflect upon the project and the cooperation with kothes?

Dilo Logo in Weiß auf transparentem Hintergrund.

"The project was handled very professionally and efficiently. The milestones were reached on time, the breakdown of the individual project steps was coherent, and the targets in terms of time, content, and costs were also met. The timeline was always tight and certainly presented kothes with one or two difficulties, but the capacities were planned both well and correctly. Also, the positive attitude and enjoyment of the project on kothes' side also contributed to the overall success."

DILO

How can we help you? Please feel free to send us a message.

CTA_Footer-Rakete